We performed a design check on this steaming vessel monorail. Index confirmed the required rating capacity, checked load and performed an FEA, providing a report on the job for areas of the monorail that needed replacement.
8 Tonne Monorail FEA
![](https://indexengineering.co.nz/wordpress/wp-content/uploads/2021/07/index_8-Tonne-Monorail-FEA-930x620.jpg)
We performed a design check on this steaming vessel monorail. Index confirmed the required rating capacity, checked load and performed an FEA, providing a report on the job for areas of the monorail that needed replacement.