We performed a design check on this steaming vessel monorail. Index confirmed the required rating capacity, checked load and performed an FEA, providing a report on the job for areas of the monorail that needed replacement.
8 Tonne Monorail FEA

We performed a design check on this steaming vessel monorail. Index confirmed the required rating capacity, checked load and performed an FEA, providing a report on the job for areas of the monorail that needed replacement.